So, without wasting a second, I started on what I am currently referring to as "Phase 2 - Everything including the kitchen sink." That's right folks, take a good long look at her, because in a few short months, she's going to look completely different...and no, I'm not referring to my lovely, pregnant wife Suzanne, rather our ugly, outdated, and cramped kitchen! Here's a picture for you to ponder...oh, what will he do, what will he do?
O.K., o.k., I know, the suspense is killing you right?! Well, for starters, I'll be installing this (yep, all 37 boxes of it!)
throughout the downstairs, including the kitchen, sun room, half-bath, back hallway, family room, dining room, and foyer. And as if that weren't enough, I'll also install this up the stairs and in the upstairs landing. But before I can do that, I have to scrape the popcorn ceilings in the kitchen, sun room, and half-bath, and also tear out the existing kitchen cabinets. Things should start rolling later this weekend...I'll try and post an update late Sunday night!




2 comments:
I love the bamboo flooring! I very much miss ours from our house in Bethesda. And by the way, CONGRATULATIONS on the little Younger-to-be! Sara
thanks Sara, we're looking forward to the new bamboo as well as the new bambino! You guys will have to come up for a visit once both are here :)
Post a Comment