I'm starting to feel the pressure now to get the house back in working order, but as I like to remind Suzanne, they didn't build Rome in a day! The Floor Guys did a great job installing the bamboo floors, although they drove me crazy with how they made themselves at home during the week that it took them to do the installation. I just had to keep telling myself that the ends would justify the means, otherwise, I probably would have strangled the flooring guys. In the end, everything turned out well and I would certainly recommend these guys for any of you looking to have some hardwoods/bamboo/cork floors installed anytime soon.









Today, I'm prepping the walls in the living room for a new coat of yellow paint! I also installed a plastic workshop sink in our kitchen that will serve as a temporary sink until the cabinets show up in a week or so. My goal for this weekend is to get the downstairs painted and ready for the cabinet install. I'll post some before and after pics once I finish up.

Monday, October 22, 2007

Back to school

Suzanne and I (and the 2 dogs) are now living in the equivalent of a college dorm room. Everything that was downstairs is now upstairs in one of the three bedrooms, including a make-shift kitchen that consists of a microwave, a toaster oven, and a crock pot. Suzanne washed our dinner dishes in the guest bathroom sink and the dogs won't even venture downstairs because of the mess! I spent the weekend tearing out the kitchen cabinets and the drywall in the half bath-minus a short break to drive Suzanne to the ER. The flooring guys showed up first thing this morning and gutted the existing carpet, linoleum, and wood flooring. They should spend the better part of this week installing the bamboo. I'll post more pics as they make progress this week.








Sunday, October 14, 2007

The Pilgrimage

No, not this one...


















I'm talking about this one...





That's right folks, Suzanne and I were in D.C. this weekend for a friend's wedding and somehow I convinced her to stop with me at IKEA in the Potomac Mills Mega-shopping area on our way home today. I told her that all I wanted to do was look at the cabinets that I was planning on ordering for the kitchen and I also needed to pick up 2 glass medicine cabinet shelves.

Well...2 hours later, and we were walking out of the store with a big bag of goodies, and the best part - I was able to actually order the cabinets at the store today! Yep, because IKEA offers an online kitchen design tool, I had been tinkering with the kitchen cabinet layout for about a month now and pretty much had it the way I wanted it. You can save your design to the IKEA server, which I had done, and I was able to access my design right there in the store today! All we needed to do was print out our parts list and the sales associate helped get the order placed.
So, the cabinets should be here the first week of Nov., the floors start getting installed a week from tomorrow, and if I can ever get this blasted order to actually go through the system at Sears.com (don't ask, I'll blog about it soon), then the appliances should be here about the time the cabinets arrive.
Stay tuned, there should be some pretty significant updates on the Blog over the next month or so!

Monday, October 1, 2007

Demolition Derby

Tonight, my buddy Derrick Weaver came by to help me tear out the closet wall under the stairs and rebuild the divider wall and new closet door in the hall way. Derrick and I go way back in our remodeling world, in fact, I helped him demolish his old kitchen about 6 years ago so I suppose turn about is fair play!


We began by tearing out the 3 layers of linoleum and luan sub flooring (I kid you not, there were actually 3 layers of linoleum, 2 of which were identical...go figure?!?). This resulted in a big pile of debris and a whole lot of sweat.





We broke for dinner (thanks to Suzanne, who made her famous black bean lasagna last night so that all we had to do was pop it in the oven and 45 minutes later, dinner was served!). With full bellies, we went back to work. My grand plan..or actually, Wendy Smith's "grand plan" was to move the fridge from its intrusive spot in the kitchen and tuck it away in the closet under the stairs. In doing this, we would actually gain some additional counter top and cabinet space so it sounded like a good plan to Suzanne and me.


Derrick and I started the demo of the load bearing wall by adding temporary supports to the ceiling joists. While I have never dealt with load bearing walls before, this turned out to be a fairly simple task...thanks to Derrick and his previous experiences. I was especially happy because I got to use my reciprocating saw to tear out the old studs and base plates of the existing wall...exciting, I know!


Derrick stuck around long enough to give me some pointers on how to frame up the new closet door for the chest freezer, then headed home to his family at 9:30 PM. With Derrick gone, I finished the rough-in of the new closet door, built the new divider wall that will go between the fridge closet and the freezer closet, and closed up the original door opening. All in all, it was a good night.


Next up, I need to finish scraping the popcorn off the kitchen ceiling, sand and mud the areas of the ceiling that need touching up, and then install my lighting and finally paint the ceiling. My plan is to try and knock out all of this before the bamboo floor installers show up on the 22nd of this month. It's going to be a busy couple of week nights for me for sure.