You may be asking yourself, "Is it snowing in Durham today?" Or perhaps you are thinking, "Has the stress of home remodeling pushed Craig over the edge to the point he is now snorting coke?" Well, fear not loyal reader(s), that white powered on my face is not snow or "blow", it is; however, drywall dust from my 5th round of sanding the ceiling in the kitchen. I've got the final skim coat of mud on the ceiling now and it is drying. Once dry, I'll give it one final light sanding and then roll on two coats of paint. After that, I'm popping the cork on a tasty beer to celebrate the end of the worst job so far...ceiling repair! My hope is to have the ceiling finished in a few hours and then start placing the base cabinets and appliances. Check back later tonight and hopefully there will be some pictures showing my progress for the day.
Sunday, December 9, 2007
Saturday, December 8, 2007
I need a big weekend...
Funny how I can't get the Tom Petty song, "Big Weekend" out of my head today. The chorus of ,"I need a big weekend.Kick up the dust.Yeah a big weekend.If you don't run, you rust" just seemed fitting for my weekend. As I type this, my arms, face, and hair are covered in white drywall dust and my nose is "crusty" from inhaling the dust...yummy!
Last week, the Floor Guys stopped by to replace the kitchen floor that was damaged from my first water leak. They knocked out the repairs in one day and the floors look great! Once I get the ceiling finished, I can start installing the base cabinets and appliances! The gas company is coming out on Monday to look at running a new fuel line for the stove, but I found out from them on Friday they won't be able to actually do the installation until the first week in January. Oh well, I guess we'll just have the oven working until then!



Since I last left you guys, I've kicked up the dust for sure! The recessed can lights are now in and functioning and I'm in the process of doing some serious drywall repair to the ceiling. I ended up having to cut out more of the existing ceiling than originally planned (here's a tip I learned...reciprocating saws cut through copper water pipes like butter!). Yep, I had a slight mishap while installing the can lights and ended up nicking a water supply line with my reciprocating saw. Thankfully, I was able to shut off the water quickly and Suzanne came running with multiple beach towels to soak up the water that was pouring from the ceiling. The copper supply line got repaired and I finished installing the recessed lights and patched up the drywall. I've spent the better part of 2 weekends getting the ceiling smoothed out and ready for the final coat of paint.
Last week, the Floor Guys stopped by to replace the kitchen floor that was damaged from my first water leak. They knocked out the repairs in one day and the floors look great! Once I get the ceiling finished, I can start installing the base cabinets and appliances! The gas company is coming out on Monday to look at running a new fuel line for the stove, but I found out from them on Friday they won't be able to actually do the installation until the first week in January. Oh well, I guess we'll just have the oven working until then!
Once the cabinets are set, it's on to the counter tops. I'll post more pics later on Sunday, but until then, here are some shots of the lights and ceiling patch repair that I am currently working on.
Sunday, November 18, 2007
Houston...we have a problem.
Holy cow, I just looked at my last post here at it is from Nov. 6. That's almost 2 weeks ago and I feel like it has been more like 2 months ago! Let's see, where did I leave off? Oh yes, I was hoping to have the cabinets installed and possibly even the appliances at this point; however, as things inevitably go with home renovations, they haven't quite gone as planned. 4 weeks ago, Suzanne sprained her ankle while out running the Woodcroft trails. On the same day, Holden was diagnosed with elevated blood calcium levels, which would eventually lead to him having to undergo surgery at the NC State vet school in order to remove one of his four parathyroid glands.



And then last Wednesday evening, I walked through the door after losing a really crappy game of indoor soccer, only to find a ginormous puddle of water on the brand new bamboo kitchen floor. Turns out one of my new supply valves for the kitchen sink decided to spring a pin-hole size leak, which are the worst because you typically don't notice them until it is way too late. Judging by the amount of water on, under, and in the bamboo floor, not to mention in the crawl space beneath the house, this thing had probably been leaking for a good 2 or 3 hours straight. Long story short - I got the leak fixed, the floors dried out, and everything back together by about 11 pm that night. Lawerence Green is coming by on Wednesday to check out the damage and help me come up with a game plan for fixing the buckling, stained floor in the kitchen.
Oh yeah, and did I mention that last weekend, prior to the water leak, as I was assembling the kitchen cabinets from IKEA late on Saturday night, I had one of those "ah ha" moments. My original plan for the kitchen involved moving the half-wall out about a foot to accommodate a wall oven. Well, after constructing a mock cabinet out of cardboard to see just exactly what this wall oven cabinet would do to the feel of the kitchen, Suzanne and I decided to scrap the wall oven design. Sounds pretty simple, right? Well, it was, except that I forgot to change that one little dimension for the length of wall back to its original measurement since I wouldn't be moving the wall now. So, as I was putting the cabinets together at about 10 pm, I suddenly felt a wave of panic come over me as I realized that I had forgotten to re-size my kitchen design and that the cabinets that I was now assembling were actually going to be exactly one foot to long!! I ended up taking Monday off of work to drive up to IKEA, just south of DC, to return the cabinets that I had and buy new cabinets that would fit. After 7 hours of driving and 2 hours of shopping, I was back in Durham with the right cabinets and ready to start putting the kitchen back together.
Last weekend I hung sheetrock in the half bath and fridge alcove, re-plumbed the ice maker line, bathroom supply valves, and kitchen supply valves. This weekend, I hung the wall cabinets. Installed the doors and handles, started on the finish moulding, and picked up the appliances at Sears. It took 3 guys (me, Aaron, and one of my neighbor's friends) to get the beast of a stove into the house. I also am the proud new papa of a matching dishwasher and microwave hood. Once Lawrence comes by on Wednesday, I should know if the floors are going to need to be replaced or not and depending on that, can start installing the base cabinets and appliances. If the floors need to be replaced, then the cabinets and appliances will have to wait a week or two before being installed. Trust me, I've got plenty of other things I can work on while waiting for the floors!
Up next...find out about the floors, install the remaining cabinets and appliances, install the recessed lighting in the kitchen, finish sheetrocking the fridge alcove and coat closet under the stairs, and then start painting!
Tuesday, November 6, 2007
1 down...563 to go!
So last week I finished up the living room, check that off the ever growing list. I feel like I've made a small dent in a gigantic project, but I'll keep carving away the stone until it is done.
It ended up taking 2 coats of yellow paint to cover up the dark blue in the living room, but in the end Suzanne and I are both pretty pleased with the new color in the room. I need to install the blinds and curtains, but otherwise, the room is pretty much finished.

It ended up taking 2 coats of yellow paint to cover up the dark blue in the living room, but in the end Suzanne and I are both pretty pleased with the new color in the room. I need to install the blinds and curtains, but otherwise, the room is pretty much finished.
This week, things are moving quickly. The cabinets from IKEA showed up last Thursday and are currently residing in our dining room (they come in flat boxes and need to be assembled).
The appliances are scheduled to be here on Friday of this week, which basically leaves the bottleneck on me. This weekend, I plan on knocking out some of the jobs that are holding me back. I will begin by rerouting the water supply line for the ice maker (woo hoo...I get to use a blow torch!). Then, I'll sheetrock the bathroom, fridge alcove, and small portions of the kitchen and closet. Once the drywall is back up, I can hopefully start hanging cabinets!
Stay tuned for another update on Sunday night or Monday night...it's going to be a long weekend here in the Younger house.
Saturday, October 27, 2007
They didn't build Rome in a day
I'm starting to feel the pressure now to get the house back in working order, but as I like to remind Suzanne, they didn't build Rome in a day! The Floor Guys did a great job installing the bamboo floors, although they drove me crazy with how they made themselves at home during the week that it took them to do the installation. I just had to keep telling myself that the ends would justify the means, otherwise, I probably would have strangled the flooring guys. In the end, everything turned out well and I would certainly recommend these guys for any of you looking to have some hardwoods/bamboo/cork floors installed anytime soon.





Today, I'm prepping the walls in the living room for a new coat of yellow paint! I also installed a plastic workshop sink in our kitchen that will serve as a temporary sink until the cabinets show up in a week or so. My goal for this weekend is to get the downstairs painted and ready for the cabinet install. I'll post some before and after pics once I finish up.
Monday, October 22, 2007
Back to school
Suzanne and I (and the 2 dogs) are now living in the equivalent of a college dorm room. Everything that was downstairs is now upstairs in one of the three bedrooms, including a make-shift kitchen that consists of a microwave, a toaster oven, and a crock pot. Suzanne washed our dinner dishes in the guest bathroom sink and the dogs won't even venture downstairs because of the mess! I spent the weekend tearing out the kitchen cabinets and the drywall in the half bath-minus a short break to drive Suzanne to the ER. The flooring guys showed up first thing this morning and gutted the existing carpet, linoleum, and wood flooring. They should spend the better part of this week installing the bamboo. I'll post more pics as they make progress this week.


Sunday, October 14, 2007
The Pilgrimage
No, not this one...



That's right folks, Suzanne and I were in D.C. this weekend for a friend's wedding and somehow I convinced her to stop with me at IKEA in the Potomac Mills Mega-shopping area on our way home today. I told her that all I wanted to do was look at the cabinets that I was planning on ordering for the kitchen and I also needed to pick up 2 glass medicine cabinet shelves.
Well...2 hours later, and we were walking out of the store with a big bag of goodies, and the best part - I was able to actually order the cabinets at the store today! Yep, because IKEA offers an online kitchen design tool, I had been tinkering with the kitchen cabinet layout for about a month now and pretty much had it the way I wanted it. You can save your design to the IKEA server, which I had done, and I was able to access my design right there in the store today! All we needed to do was print out our parts list and the sales associate helped get the order placed.
So, the cabinets should be here the first week of Nov., the floors start getting installed a week from tomorrow, and if I can ever get this blasted order to actually go through the system at Sears.com (don't ask, I'll blog about it soon), then the appliances should be here about the time the cabinets arrive.
Stay tuned, there should be some pretty significant updates on the Blog over the next month or so!
Subscribe to:
Posts (Atom)